Trinity Church approached Sustainable Energy Engineering in 2018 seeking to reduce their growing electricity costs. As a high-usage site with extensive daytime operations, they were an ideal candidate for a commercial-scale solar PV system.
We designed, supplied, and installed a bespoke 16.8kW system made up of 300W JA Solar panels and a Solis 20kW 3-phase inverter. The solution was tailored to deliver reliable output, helping the church reduce operational costs and environmental impact.
The system is expected to generate around 11,743 kWh annually, resulting in an estimated saving of £1,428.25 per year. Following the project, Mr. Pickard of the Church Board commended our team for delivering a professional and timely installation — a project that continues to serve both economic and environmental goals.
| System Size: | 16.8kW |
| Estimated Annual Production: | 11,743 kWh |
| Panels: | 56 × 300W JA Solar Panels |
| Inverter: | Solis 20kW 3 Phase Inverter |
| Annual Savings: | £1,428.25 |
| Annual CO₂ Savings: | 5,050 kg |
| Installation Date: | October 2019 |
With hundreds of five-star reviews spanning decades, Sustainable Energy Engineering has built a reputation for quality, honesty, and reliability. Unlike many short-lived installers, we're here for the long haul, ready to support you long after installation. That's why so many customers choose us after their original installer disappears. Choose us for peace of mind, fair pricing, and expert solar solutions that last.
© Sustainable Energy Engineering Limited. All Rights Reserved.
Company Registration Number: 5942135. VAT Number 939 5459 70. Established in 2006.
Website Design & SEO by SEMtelligence.